I rise to present the Budget Estimates for 1999-2000 for the Indian Railways.
Introduction
This government is about to complete one year in office. During this period, a "Status Paper" and "White Paper", have been placed before the Parliament, to help appreciate the financial position, shortage of resources and the various challenges and difficulties faced by Indian Railways. I am happy to report that on some of these issues, we have taken concrete steps as I shall presently explain in the speech.
The year 1998-99 has been a difficult one, not only
for the Railways, but perhaps for the whole country. Our industrial and
financial growth have been affected by the global financial crisis and
various other difficulties, impacting the Railway system also. Freight
loading has not been as per our expectations. On the other hand, expenditure
has gone up considerably as a result of the Fifth Central Pay Commission's
recommendations. Mr. Speaker, Sir, such circumstances would have discouraged
any other organisation but I am happy to say that without being disheartened
by such adverse situations, we succeeded in achieving many of our objectives.
Notwithstanding the constraint of resources, we have enhanced passenger
carrying capacity of trains by attaching two or more coaches in 100 popular
trains. Thus, by adding 440 additional coaches, we generated carrying capacity
of more than 29,000 passengers per day. Apart from this, 124 new trains
were introduced, the run of 32 trains was extended and the frequency of
32 trains increased. I am happy to state that all announcements made regarding
passenger trains in 1998-99 with the exception of one, have been fulfilled.
"1999-2000 - Passenger Year"
Sir, the progress made in passenger services during this year has not made us complacent. I propose to declare the year 1999-2000 as the "Passenger Year" and take still greater strides in this direction. It will be our earnest effort to not only provide reliable and better services but it will also be our endeavour that our staff behave more courteously and the passengers get reservation easily. We will make efforts to make at least one station in each Division as model station where higher level of passenger facilities will be provided and to upgrade some selected passenger terminals. I would like that improved amenities are provided on all passenger trains but, in the first phase, special emphasis will be given to the maintenance of 30 Mail and Express trains, apart from Rajdhani and Shatabdi trains, so as to ensure that there are no complaints in this respect.
Sir, during the "Passenger Year", our efforts to
control the activities of the touts will be greatly intensified. To begin
with, in the first phase, our effort will be to make Calcutta, Mumbai,
Delhi and Chennai free of touts. We are aware that this is a very difficult
task but all necessary steps will be taken to achieve this.
Passenger Amenities
One of our most important goals has been to continuously improve passenger amenities. In the current year also, we have taken a number of steps which I would like to mention :-
Sir, whenever we talk about passenger services on Indian Railways, the safety of passengers is our foremost concern. The disastrous and unprecedented accident at Khanna is still deeply etched in my mind and continues to move and unnerve me. This tragedy has raised questions regarding several aspects of railway safety. It is imperative that we find early solutions to them. This matter has been given serious thought by the Railway Ministry and a plan has been drawn up for improving safety. I would also like to inform this august House that a one-man Commission of enquiry under the chairmanship of a sitting judge of Punjab and Haryana High Court, Justice G.C.Garg, is being constituted to enquire into the Khanna accident.
There is no doubt that, inspite of a significant
increase in passenger and goods traffic in the last 50 years, statistically
the number of accidents have come down. However, we cannot afford to be
complacent, and in view of the increasing pressure on existing assets,
we are taking special steps. I would now like to mention some of the important
ones.
In the last decade, there has been no significant reduction in the number of accidents taking place at level crossings. Most of these accidents are due to the carelessness of the road users. This problem can be solved only by providing road overbridges/underbridges. However, the situation can also be improved if unmanned level crossings are converted into manned level crossings. Out of a total of 40,517 level crossings, 24,359 are unmanned. Rs. 2,200 cr are required to convert all these level crossings to manned level crossings. Although it is essential to have road overbridges/ underbridges at busy level crossings, this would involve enormous resources, as generally Rs. 8 cr to Rs. 10 cr are required for constructing one road overbridge and more than 1,000 such bridges would be required as per the norms. State Governments are also required to share the cost of these works. However, resources of this magnitude are neither available with the Indian Railways nor with the State Governments. Hon'ble Members will surely appreciate the enormity of the problem. Railway Ministry have decided to create a Fund for converting unmanned level crossings to manned level crossings and for construction of road overbridges/underbridges at busy level crossings. A separate Plan Head will also be created in order to focus attention on the funding for such works and monitoring their progress. Adequate funds will be contributed so that maximum number of level crossings can be converted in a planned manner in future.
To strengthen safety in this area, I also seek the
assistance of Hon'ble Members. They can now recommend conversion of unmanned
level crossings to manned level crossings under "Member of Parliament Local
Area Development Scheme". This has been approved by the Ministry of Programme
Implementation. Railways have decided that they will convert as many unmanned
level crossings to manned level crossings as are done through funds provided
by the Hon'ble Members in their constituencies.
Railway Recruitment Board
Action has already been taken on all the announcements
made regarding Railway Recruitment Boards in the last Budget. The recruitment
process has been made transparent and the possibility of corrupt practices
has been eliminated. Experience shows that in the selection procedure,
there was possibility of favouritism during interviews. In order to eliminate
even the slightest possibility of favouritism, I have decided that for
most of the categories, the system of interviews after the written examination
will be done away with. Based on the results of this change, we will continue
with our endeavour to further improve the process of selection so that
selection of meritorious candidates for the Indian Railways is ensured.
Group 'D' Recruitment in Railways
After the success of our efforts made in the selection
procedure of Group 'C', we will now endeavour to improve the Group 'D'
selection procedure. Presently, the direct recruitment of Group 'D' staff
in Railways is done only through interviews. To streamline the recruitment
procedure and make it more transparent, I have decided that selection of
Group 'D' (unskilled) category should be through an objective written test
of appropriate standard. In this procedure there will be no interviews
and selection will be done on the basis of marks obtained in the written
examination, subject to candidates being physically fit. It has also been
decided that this recruitment will be done by a unit of the Railway Recruitment
Board, which will be headed by a senior railway official. I am confident
that with this modified procedure, direct recruitment of Group 'D' will
become fully impartial and provide suitable and capable employees to the
railways.
Upgradation of Technology
It has been the endeavour of Indian Railways to constantly
upgrade its technology. Recently a state-of-the-art 3-phase 6000 HP electric
locomotive has been manufactured at Chittranjan Locomotive Works, which
is an unprecedented achievement amongst the developing countries.
Contribution to improvement in Environment
Railways are alive to environmental issues and to show our commitment in this direction, it has been decided that the sale of cigarettes/bidis in railway platforms and passenger trains will be banned from 5th June, 1999, the "Environment Day".
Afforestation drive on railway land will be started
with zeal. This will ensure proper utilisation of available land and also
prevent encroachment. It will apart from meeting the need of wooden sleepers,
also benefit Railways financially in future.
Commercial utilisation of Land
Mumbai Rail Vikas Corporation has got the necessary
approvals for commercial utilisation of land and air space for mobilising
resources. We are hopeful that through such efforts we will be able to
mop up sufficient resources for developmental works in other parts of the
country.
Operating and Financial Performance in 1997-98
Now I would like to briefly describe the operating
performance of Indian Railways in the last financial year, 1997-98. The
Railways have moved 429.30 million tonnes of originating revenue earning
traffic which is almost equal to the target of 430 million tonnes. In 1997-98,
Railways financial performance was also satisfactory. Gross Traffic Receipts
of the Railways recorded a growth of 17.6%, from Rs. 24,319 cr in 1996-97
to Rs. 28,589 cr in 1997-98. Total Working Expenses increased from Rs.
21,001 cr to Rs. 25,876 cr, mainly due to the implementation of the recommendations
of the Fifth Central Pay Commission. After accounting for some reliefs
relating to the previous years, based on the recommendation of the Railway
Convention Committee, Railways paid a dividend of Rs. 1,489 cr to the General
Revenues. Railway's Operating Ratio also improved from the revised estimate
target of 91% to 90.9%. Fund balances of the Railways increased by Rs.
194.67 cr and became Rs. 3,565 cr. Along with market borrowings, Plan outlay
was Rs. 8,239 cr, which was marginally short of the Revised Estimate of
Rs. 8,403 cr.
Revised Estimates, 1998-99
Sir, unlike 1997-98, the current financial year has not been very favourable. While the loading of Petroleum products, Fertilisers and "Other Goods" is higher than the budgetary target as well as the actuals of last year for the first nine months, the reduced demand of core sector commodities such as Coal, Food-grains, Iron & Steel, Cement and Iron Ore etc. has affected the railways' freight traffic. Against the budgetary forecast of 450 million tonnes, it is expected that Railways will achieve a loading of around 424 million tonnes. However, our efforts to increase loading in the remaining part of the year will continue. With the drop in freight traffic, it is expected that there will be a shortfall of Rs. 1,056 cr in the earnings as compared to the target for the year, despite increase in Passenger, Other Coaching and Sundry earnings. The budgeted target of clearing Rs. 260 cr from Traffic Suspense has been maintained in the Revised Estimates. Gross Traffic Receipts have been scaled down from the Budget Estimates of Rs. 31,472 cr to Rs. 30,416 cr.
At the same time, as a result of the recommendations of the Fifth Central Pay Commission, an increase of Rs. 1,530 cr is expected in the payment of pensionary dues, which has now increased to Rs. 3,830 cr from Rs. 2,300 cr. To meet the shortfall in earnings, a saving of Rs. 345 cr has been effected in non-plan expenditure. Plan expenditure has also been re-assessed and kept at Rs. 8,755 cr as against the budgeted outlay of Rs. 9,500 cr. It is proposed to withdraw Rs. 1,313 cr from the Railway Fund balances to meet the additional pensionary liabilities. With this, the Fund balances are estimated to be Rs. 2,252 cr. A provision of Rs. 1,752 cr has been made for payment of dividend.
I would like to assure the Hon'ble Members that the
Plan expenditure has been regulated in such a manner as to ensure that
the progress of safety and other targeted works is not allowed to suffer.
However, to achieve this, additional market borrowing of Rs.180 cr by the
Indian Railway Finance Corporation would be necessary. With this the total
market borrowings will increase from Rs. 2,900 cr to Rs. 3,080 cr.
Steps taken by Railways to increase Revenues
Sir, the freight loading in the current year has been a matter of concern despite various efforts made. Only recently some signs of recovery have been noticed and we hope that the coming year will be more favourable. Innovative marketing efforts are being made to increase loading on the railways and we hope to increase loading of 'Other Goods' traffic rather than depend only on core traffic like Coal, Iron & Steel, raw material for steel plants etc. Now I would like to elaborate the various steps taken by Railways to increase revenue :-
Passenger Services
Sir, people's representatives and the public often make requests to either start new trains, increase the frequency of trains, extend the run of trains or provide additional halts. Much as I would like to, it is not always possible to fulfill such demands due to limitation of resources and other technical reasons. However, within the available resources, it is proposed to provide the following 14 new train services :-
Shalimar - Haldia Intercity Express
Secunderabad - Machhilipatnam Express
Mumbai - Sawantwadi - Madgaon Intercity Express
Kurla - Patna Superfast Express (Biweekly)
Amritsar - Dharbanga Express via Narkatiaganj (Biweekly)
Jaipur - Bangalore Express via Secunderabad (Biweekly)
Guwahati - Chennai Express (Biweekly)
Delhi - Gandhidham Express (Biweekly)
Delhi - Coimbatore Express (Weekly)
Pune - Ernakulam Express (Weekly)
Raichur - Gulbarga Intercity Service
Kamakhya - New Bongaigaon Passenger
Patna - Mughalsarai Passenger via Gaya
8463/8464 Bangalore - Visakhapatnam Express from 2 days a week to 4 days a week
1095/1096 Pune - Ahmedabad Ahimsa Express from 3 days a week to 4 days a week
2101/2102 Kurla - Howrah Super Deluxe Express from weekly to 3 days a week
5207/5208 Amritsar - Barauni Express to Katihar
4737/4738 Bikaner - Jaipur Express to Ajmer (M.G.)
5741/5742 Alipurduar - Siliguri Intercity Express to New Jalpaigur press on 2 days a week to Bhusaval
6343/6344 Ernakulam - Nizamuddin Swarnajayanti weekly Express to Tiruvananthapuram
2307/2308 Jodhpur-Howrah Express (daily) running via Grand Chord will run via Main Line one day in a week.
On completion of gauge conversion, the following improved
broad gauge services shall be provided :-
Three pairs of passenger services on Indara - Phephna section
Three pairs of passenger services on Lalkuan - Kashipur section
MEMU, DMU and Rail Bus services shall be introduced on the
following sections :-
MEMU Services
Vijayawada - Kakinada section
Kakinada - Visakhapatnam section
Durg - Raipur- Bilaspur section
Vijayawada - Bhimavaram - Narsapur (B.G.)
Delhi - Shamli (B.G.)
Mehasana - Tarangahill (M.G.)
Tiruturaipundi - Agastiampalli (M.G.)
Security on Railways has been a matter of concern and Hon'ble Members have also been expressing their dissatisfaction in this regard. Although the subject of law and order on the railways falls under the purview of the State Governments, we have been constantly striving to improve the coordination between the Government Railway Police (GRP) and Railway Protection Force (RPF). In this regard, I had also convened a high level meeting of Home Secretaries of State Governments, Heads of GRP and the officers of the RPF in August 1998. With these coordination efforts, the situation is likely to improve.
Improvements are also being made in the functioning
of the RPF and necessary action has been initiated to give more investigative
powers to the officers of RPF. Approval has already been given for setting
up two additional battalions for the Railway Protection Special Force (RPSF)
and it is proposed to add another two battalions in future.
Association of Railway Protection Force
Hon'ble Members may recall that the Railway Protection
Force, for quite some time, has been requesting recognition of their association.
This issue has also been raised in this House. I am glad to inform that
recognition to Railway Protection Force Association has been restored.
Annual Plan 1999-2000
The Plan outlay for 1999-2000 has been kept at Rs. 9,700 cr. This implies an increase of Rs. 945 cr over the Revised Estimate of last year. This increase in plan outlay has been possible due to increase in Capital from the General Exchequer to the level of Rs. 2,540 cr as against Rs. 2,200 cr in the previous year. In percentage terms, this is 26% of Plan outlay which is the highest since 1993-94. I would like to thank the Hon'ble Prime Minister, the Finance Minister and the Planning Commission for this increase in Capital Support from the General Exchequer. However, I would earnestly request the Finance Minister to increase this support by another Rs. 200 cr so that, in this "Passenger year", we are in a position to serve the passengers in still better ways. I do hope that the Finance Minister will accede to my request. I am sure the passengers will also join me in thanking the Finance Minister.
As far as internal resource generation by the Railways is concerned, I mentioned earlier that the working expenses of Railways have increased after acceptance of the recommendations of the Fifth Central Pay Commission. The working expenses in 1999-2000 cannot remain unaffected by this. Moreover, the trend of growth of freight traffic has also slowed down. This has resulted in reduced generation of internal resources which are not sufficient to meet the plan requirement. I therefore propose to withdraw Rs. 1,000 cr from the Railways' Fund balances. As in previous years, extra budgetary resources, mainly through market borrowings by the Indian Railway Finance Corporation, will provide the balance requirements for the Plan.
Sir, the thrust of this Annual Plan is on Safety. The outlay on Track Renewal Plan Head has been increased to Rs. 1500 cr which is 19 % over Revised Estimates, 1998-99. Maintaining the trend of last year to expedite track circuiting and other safety related works, allocation under Signal & Telecommunication Plan Head has been increased from previous year's Revised Estimate of Rs. 325 cr to Rs. 375 cr. In view of the importance of doubling of track for increasing line capacity, the allocation for this Plan Head has been raised from Rs. 472 cr to Rs. 625 cr which is an increase of 32%. To improve passenger amenities, the allocation under Passenger Amenities Plan Head has been increased by 45% as compared to the Revised Estimates. For speedier progress of metropolitan transport projects in Calcutta, Chennai and Mumbai, allocation of Rs. 300 cr has been made, representing an increase of 52% over the previous year.
To extend rail network to new areas of the country, Rs. 600 cr have been allocated under the Plan Head New Lines, representing an inc>
New Projects
As you are aware, at present Indian Railways have pending projects involving outlay of about Rs. 34,000 cr, out of which new line projects and gauge conversion projects are about Rs. 20,000 cr and Rs. 9,000 cr respectively. Keeping this in view, recently Railway Ministry has, after the approval of Cabinet, determined the priorities of projects. The allocation of funds for various projects has been made not only on the basis of operational requirement but also keeping in view the development of backward areas. As far as possible, regional balance has also been kept in view.
Last year, when I took charge of the Railway Ministry,
the Railways had a large number of projects which did not have necessary
approvals. I am happy to inform the House that during the year, necessary
clearances have been received for many projects. These are as follows :-
New Lines
Macherla to Nalgonda
Angamali to Sabarmati via Erumeli
Lalitpur to Satna, Rewa-Singrauli and Khajuraho-Mahoba
Diphu to Karong
Ranchi to Koderma via Hazaribagh
Dharmavaram to Penukonda via Puttaparthy
Chandigarh to Ludhiana
Taran Taran to Goindwal
Kalka to Parvanoo
Bishrampur to Ambikapur
Baramati to Lonand
Bangalore to Satyamangalam
Bidar to Gulbarga
Gadwal to Raichur
Dumka to Baidyanathdham
Madurai-Rameswaram
Quilon-Tirunelveli-Trichendur-Tenkasi-Virudunagar
Katakhal-Bhairabi
New Jalpaiguri-Siliguri-New Bongaigaon
Bankura-Damodar Railway Line
Kusunda-Jamunia Tand
Ludhiana-Amritsar
New Lines
I am happy to state that the Railways, despite limited resources, have completed construction of the 174 km Talcher-Sambalpur line. Along with this, we have completed the Panihar-Khajuri section of Guna-Etawah line completing the link between Gwalior and Guna.
However, the work on the Goalpara-Guwahati line which was targeted for completion in this financial year has been affected by the adverse law and order situation and will now be completed in the coming financial year.
New line projects, included in the 1999-2000 Budget are :-
Kakinada to Pithapuram new line, to be taken up after obtaining the requisite clearances.
Section Km
Bongaon-Petrapole 8
Goalpara-Kamakhaya 124
Peddpally-Karimnagar 35
Jaruri-Banspani 11
Kapadvanj-Modasa 60
In order to expedite progress on the Qazigund-Baramulla
line in the State of Jammu and Kashmir, it has been decided,
with the approval of the Cabinet Committee on Economic Affairs (CCEA),
to get the work executed through M/s IRCON International.
Gauge Conversion
In 1998-99, the Railways have completed the gauge conversion of the following sections :-
Tiruchchirappalli-Dindigul
Shivsagar-Moranhat
Mariani-Jorhat
Babupet-Balarshah
Solapur-Hotgi
Indara-Phephana
Section Km
Nonera-Seoni 27
Kashipur-Lalkuan 60
Mudkhed-Adilabad 162
Arakkonam-Chengalpattu 63
Yellahanka-Yeshwantpur 17
Lakshman Tirtha bridge diversion on Mysore-Hassan line 1
Morbi to Maliya-Miyana and Dahisara to Navlakhi 68
Dharangdhara-Kuda 33
Gandhidham-Bhuj 58
Sir, it is proposed to take up the gauge conversion
of the following sections, the work on which would be started after obtaining
the requisite clearances :-
Salem-Viddhachelam-Cuddalore
Doubling
In 1998-99, the Railways will complete about 280 km of doubling projects. In 1999-2000, another 290 km on various sections of on-going works are likely to be doubled.
Hon'ble Members will be happy to know that in order to improve the flow of the growing traffic and to generate additional capacity on some saturated sections, the following new doubling works have been included in the Budget :-
Punpun to Taregana
Amroha-Moradabad
Dayabasti, Grade Separator
Chapra-Hajipur
Karpurigram-Siho
Ernakulam Jn-Ernakulam marshalling yard
Rajatgarh to Barang
Diva-Kalyan (Fifth and Sixth line)
Attipattu-Korukakkupettai (Third line)
I am happy to inform the House, that our efforts with regard to Mumbai Metropolitan Transport Project have succeeded and we have received the approval of the Cabinet for setting up of the Mumbai Rail Vikas Corporation (MRVC).
As far as the on-going projects are concerned, in New Mumbai the doubling of Belapur-Panvel line and construction of Thane-Turbhe-Nerul-Vashi Suburban corridor are progressing satisfactorily. In Mumbai, the work of Santacruz-Borivali fifth line is also progressing well. The work of second phase of the fifth and sixth lines between Kurla-Thane will be started as soon as necessary clearances are received.
It gives me pleasure to inform the House, that in the metropolitan city of Calcutta, we have decided to extend the construction of Metro Rail from Tolleyganj to Garia. In addition, we have included in this Budget the single line connection of Princep Ghat to Majerhat, thus completing the full ring of Calcutta Circular Railway. A survey has also been undertaken for doubling and electrification of this route. The work of electrification of Dum Dum to Tala is already in progress.
As regards Chennai, the work of Mass Rapid Transit
System, Phase II, between Thirumailai and Velacheri is progressing satisfactorily.
In the metropolitan city of Delhi, the Delhi Metro Rail Corporation has
started work on Phase I of Mass Rapid Transit System.
Railway Electrification
In the 9th Five Year Plan, the Railways have planned Electrification of 2300 route km out of which 445 route km have been completed in 1997-98 and we hope to complete another 500 route km in the current financial year. In the year 1999-2000, an outlay of Rs. 350 cr has been provided for Railway Electrification and a target of electrifying 500 route km has been kept.
Sir, I am happy to inform the House that the following sections have been included in the Budget for taking up Electrification. The work on these projects would be taken up after obtaining the requisite clearances.
Mughalsarai-Zafrabad (as the first phase of Mughalsarai-Lucknow via Sultanpur)
Patna-Gaya
Tambaram-Chengalpattu-Villupuram
Chengalpattu-Arakkonam
Surveys
On the basis of the requests received from the Honble Members and State Governments, I have decided to take up several surveys in the Budget for 1999-2000.
The following surveys for New Lines are being taken up :-
Agartala to Akhaura
Almatti to Yadgir
Anupgarh to Bikaner
Badlaghat-Alamnagar-Bhawanipur-Purnea-Dalkhola
Bakreshwar to Siuri
Bisrampur to Jabalpur
Chatra to Tori
Dahanu road to Nasik
Gaya to Daltanganj via Guraru, Gurva, Sherghat and Imamganj
Jabalpur to Panna via Damoh
Jaisalmer to Kandla
Punalur to Erumeli
Khandwa to Nardana via Khargone, Sendhwa
Murshidabad to Kandi via Khagraghat and Behrampur
Nagapattinam to Velankani
Ramganj Mandi to Bhopal via Jhalawar, Aklera, Khilchipur, Rajgarh, Biavra, Narsingarh
Rohtak to Hissar via Meham and Hansi
Tindivanam to Cuddalore via Pondicherry
Patna By-pass line
Kovvur-Bhadrachalam Road
Parli Vaijnath to Ghatandur (for regrading)
Umrer to Nagpur via Khaperkeda and Koradi
Makum to Saikhova Ghat
Aunrihar-Jaunpur
Mehasana-Taranga Hill
Pilibhit-Sahajahanpur
Wansjalia-Jetalsar
Tiruchirapalli-Karaikudi-Manamadurai
Renigunta to Tirupati
Baruipur-Lakshmikantpur
Daund-Manmad with electrification
Seoraphuli-Tarakeswar
Konkan Railway Corporation (KRC) is operating seven pairs of passenger trains including the Kurla-Mangalore Express and the Trivandrum Rajdhani Express. Freight operations, however, have been on a somewhat lower level than what the KRC can handle. The overall depression in freight movement on the Indian Railways has affected Konkan Railway also. Consequently, the financial results forecast of Konkan Railway for the current year are less than expected. KRC is, however, exploring every means of augmenting its services and revenues. In this context they have planned to introduce "Konkan Star Service" with modern facilities for passengers and "Roll-on-Roll-off" freight services, under which loaded goods trucks are carried to destinations.
Any new line project has to take a reasonable time
for realising its full potential. In the case of new lines funded by the
General Exchequer, the payment of dividend is deferred for a period up
to five years after opening. Konkan Railway Corporation has been built
mostly with funds borrowed from the market and has to discharge its debt
service obligations from the beginning. The organisation, therefore, definitely
needs help. I would like to assure the House that the Ministry of Railways
would provide adequate assistance to Konkan Railway, operationally and
financially, so that it can grow as a strong limb of the Railway network.
Production Units
uring 1997-98 all production units have achieved their targets. Chittaranjan Locomotive Works and Diesel Locomotive Works, Varanasi, manufactured 165 electric and 164 diesel locomotives respectively. Integral Coach Factory, Perumbur manufactured 1,010 coaches. Rail Coach Factory, Kapurthala, manufactured 1,031 coaches. Diesel Component Works, Patiala, rebuilt 74 locomotives and Wheel and Axle Plant, Bangalore, manufactured 92,015 wheels and 52,249 axles, which is an all time record.
During 1998-99, the work is going on smoothly in
all Production Units and it is expected that they would be able to achieve
their targets.
Public Sector Undertakings
Hon'ble Members will be happy to know that the performance
of the Public Sector Undertakings had been satisfactory during the year
1997-98. IRCON International Ltd. (IRCON), earned a profit of Rs. 50.30
cr along with foreign exchange earnings of Rs. 43.40 cr. The company has
completed projects in Malaysia, Bangladesh and Nepal. Container Corporation
of India Ltd. (CONCOR) had a turnover of Rs. 627 cr. and earned a net profit
of Rs.115 cr. In November, 1998, Government of India earned Rs. 225 cr
by selling 90 lakh shares of CONCOR. Indian Railway Finance Corporation
Ltd. (IRFC) earned a net profit of Rs. 167 cr. It mobilised a total of
Rs. 2,558 cr in domestic and international markets in 1997-98 to supplement
the plan resources of Indian Railways. Rail India Technical & Economics
Services Ltd. (RITES) achieved a turnover of Rs. 133 cr with a net profit
of Rs. 14.55 cr. Indian Railways received a total dividend of around Rs.
60 cr in 1997-98 from all its Public Sector Undertakings.
Research, Designs and Standards Organisation (RDSO)
RDSO is the research and designs wing of the Indian
Railways. It functions as the consultant to the Indian Railways in technical
matters. RDSO have developed the cost effective "Universal Emergency Communication
System (UECS)" to enhance safety, which will provide instant communication
between the driver, guard and the nearest station. Apart from this, they
have developed a dual voltage three-phase drive EMU design to maintain
uninterrupted EMU services in Mumbai area, during conversion of traction
system from 1500 volt DC to 25 KV AC.
Medical facilities
The health of Railway employees and their families,
who are a part of the world's largest industrial organisation, is being
looked after by the Medical Department of Indian Railways. They have made
special contribution towards Pulse Polio Vaccine, AIDS Control and family
welfare. It is worth mentioning that the birth rate in the families of
railwaymen is 14 per thousand whereas, the national average is 18 per thousand.
Industrial Relations
Permanent Negotiating Machinery (PNM), Joint Consultative Machinery
(JCM), and Participation of Railway Employees in Management (PREM) are
working satisfactorily and the industrial relations on the Indian Railways
are cordial and peaceful.
Scheduled Castes and Scheduled Tribes and Other Backward Classes
As per statutory provisions, adequate protection and reservation are being provided to the scheduled castes and scheduled tribes as well as other backward classes. Under this, reservation cells are working at every level so that their complaints can be disposed of quickly.
Sports
I am happy to inform the Hon'ble Members that the Railway Sports Control Board has been renamed as Rail Sports Promotion Board to reflect the new orientation of its purpose. In last Budget, I had mentioned that to bring about greater transparency, the recruitment against sports quota would be made through open advertisements of promising sportspersons. Procedure for recruitment has since been modified and 70% of the vacancies in the Sports quota are being filled through open advertisements.
As in the past, Railways have maintained their position
in the forefront this year also in the sphere of sports. In the recently
concluded Asian Games in Bangkok, Railways have given outstanding performance.
I take pride in mentioning that out of seven gold medals won by India,
five Gold Medals were bagged by Railway athletes. I am confident that with
the measures being taken to promote sports in Railways our sportspersons
would continue to give outstanding performance in the future also and bring
laurels for the country.
Special Announcements
Concessions for Handicapped Persons
The Orthopaedically handicapped and paraplegic persons
with their escorts presently get a concession of 75% in First Class, Second
Class, and Sleeper Class. I have decided that in future this concession
will also be available in Air-Conditioned 3 tier and Air Conditioned Chair
Car. In addition 50% concession will be given in other Air-Conditioned
classes.
Concessions to Press Correspondents
Press correspondents accredited to the headquarters
of Government of India and State Governments/Union Territories and District
headquarters are issued coupon books at 25% concession in First Class fares
and 50% concession in Second/Sleeper Class fares for journeys up to 2,500
km per month. I am happy to inform the House that with these coupon books
they can themselves avail of 50% concession in all classes for journeys
up to 30,000 km in a year.
Concessions to the Winners of President's Police Medal
As our recognition of the contribution made by the
recipients of President's Police Medal for distinguished service, it is
proposed to provide them the facility of 30% concession for travel in all
classes and by all trains, including Shatabdi and Rajdhani services, after
they attain the age of 60 years.
Concession for licensed porters
Acknowledging the significance of the services of licensed porters in
making the journey of rail passengers comfortable, they have already been
given the facility of one second class pass for self from their place of
work to any station in India once a year. It has been decided that in future
the licensed porters will also be extended the facility of one set of Privilege
Ticket Order in second class every year for self and spouse for travel
from the station of working to any station in India. With this facility,
he/she will be able to travel with spouse by paying one-third fare.
Passenger Reservation Terminals
It is now proposed to provide PRS terminals on an
experimental basis to travel agents authorised under the Rail Tourist Agents
Scheme and Rail Travellers Service Agents Scheme of the Railways at their
cost and with suitable safeguards, etc. in order to facilitate rail reservation
for common man.
Part - II
Budget Estimates 1999-2000
Sir, I shall now deal with the Budget Estimates for 1999-2000.
I think there are reasons to believe that the growth of the economy, which has been below our expectations in the current year, will accelerate next year. Relying upon that assumption, the freight traffic projection for 1999-2000 has been made at the level of 450 million tonnes. As regards passenger traffic, I expect a somewhat faster growth than in previous years. This forecast is based on the proposed augmentation of load of popular trains and other improvements in the pattern of train services. A growth of 8.5% over the current year is being taken. Other Coaching and Sundry Other earnings are expected to increase by 5% over the current year. On this basis, Gross Traffic Receipts are estimated at Rs. 32,411 cr including realisation of Rs. 200 cr of outstanding dues.
Ordinary Working Expenses of the Railways have been estimated at Rs. 25,740 cr which is higher than the Revised Estimates of the current year, of Rs. 23,375 cr, by 10.1%. This increase of Rs. 2,365 cr provides for higher levels of expenditure on materials and contractual payments required for maintenance purposes with due regard to safety. Expenditure on Security has also been enhanced. The estimates also provide for normal increases such as for staff increments, dearness allowance, lease charges on account of market borrowings, fuel etc.
The pensionary liability in 1999-2000 is estimated at Rs. 3,300 cr. It has reached a higher level after the year 1996-97 consequent upon liberalisation of benefits to more than ten lakh Railway pensioners following the recommendations of the Fifth Central Pay Commission. Appropriation to the Pension Fund from Revenue is proposed to be made to the extent of Rs. 2,954 cr as compared to Rs. 3,425 cr in Revised Estimates of 1998-99. It is also necessary to withdraw an amount of Rs. 200 cr from the balance in the Fund.
The Appropriation to the Depreciation Reserve Fund from Revenue is proposed to be made to the extent of Rs. 1,589 cr as compared to Rs. 1,600 cr in the current year's Revised Estimates. In this case also a drawdown from the Fund balance is required, to the extent of Rs. 600 cr.
The Total Working Expenses will thus amount to Rs. 30,283 cr, leading to Net Traffic Receipts of Rs.2,128 cr. Net Miscellaneous Receipts are estimated at Rs. 430 cr and thus a Net
Revenue of Rs. 2,558 cr is reached. Payment of dividend to the General Revenues has been computed at Rs. 1,914 cr as compared to Rs. 1,752 cr in the Revised Estimate of the current year based upon recommendations of the Railway Convention Committee (1996) in their Report relating to the year 1997-98. Necessary adjustment, if any required, will be made on receipt of the recommendations of the Railway Convention Committee (1998) to whom an interim memorandum is being submitted in respect of the year 1999-2000. The 'Excess' in the financial results works out only to Rs. 644 cr which falls very much short of the segments of Plan expenditure to be met from the Development Fund and the Capital Fund together totalling Rs.1765 cr.
There is thus an additional requirement of Rs. 1,121 cr for financing the works chargeable to these two Funds. A part of this requirement is proposed to be met by drawdown from the balance in the Capital Fund to the extent of Rs. 200 cr and the interest on the Fund amounting to Rs.21 cr. Thus an amount of Rs. 900 cr is to be mobilised additionally.
There was generally no increase in the freight rates in the last Railway Budget. But the cost of operations is increasing and they have to be met. Keeping this in view, I propose to make a minor increase of 4% uniformly on the freight rates of all commodities. The increase is less than the general inflation in prices. Minor adjustments in the classification for charge are also proposed to be made for Washed Coal and Caustic Soda Liquor. The increase in each case is by one step only.
I have been receiving representations from the trade to reduce the burden of idle freight on short lead traffic, which is charged for minimum 100 km. I have, therefore, decided to allow a concession of 25% in the freight rate for traffic hauled for distances up to 50 km.
Sir, there is a growing demand for improvement in passenger services. As I mentioned earlier in my speech, Railways have brought about improvements in the current year and have plans for strengthening it still further. The results have been gratifying and our esteemed customers have responded by providing buoyancy in passenger revenue. In deference to this, we have decided to give a respite to a bulk of rail passengers. In this "Passenger Year", as a special gift to about 90 % of the passengers, who travel by second class, no increase is being effected in Second Class fares, both of Mail/Express and ordinary trains. Second Class Season ticket fare will also remain unchanged. While in the "Passenger Year" we are giving better facilities to the bonafide passengers, we shall intensify our campaign against ticketless travel.
Those who take the Sleeper Class and the upper classes, however, are provided with much higher level of comfort and I think it would be reasonable to expect them to pay a little more for their journeys. I propose to introduce a rationalisation that takes into account the difference in the levels of comfort as between sleeping accommodation and sitting accommodation, as also the superior comfort of travel in air-conditioned classes. Thus keeping the fares of Second class Mail/Express as the base, the fares of other classes on Mail/Express trains are proposed to be rationalised as :-
AC Chair Car - 3 times;
AC 3-tier Sleeper - 4.5 times;
First Class - 5.25 times;
AC-2 tier Sleeper - 7.2 times; and
AC First Class - 14.4 times.
However, the existing fares of higher classes happen to be more than the fares that would be determined by this approach in some distance ranges. These are not being changed.
The fares of Rajdhani/Shatabdi Express trains are also proposed to be revised by making suitable adjustments in the existing fare structure.
The minimum distance for charge for travel in upper classes of mail and express trains is proposed to be revised to a uniform figure of 100 km for all the upper classes.
The minimum distance for charge in the Sleeper Class, which is 200 km, will not hereafter apply to travel in certain sections where Railways have declared sleeper coaches to be unreserved on certain trains; normal Sleeper Class fares only will be levied in such cases. As in the case of freight rates, an increase of 4% is proposed to be applied on all parcel and luggage scales.
These proposals will come into effect from 1.4.1999. They are expected to yield an additional revenue of Rs. 900 cr during the full year. This is made up of Rs. 700 cr from freight traffic and Rs. 200 cr from Coaching Traffic which includes Passengers, Parcel and Luggage.
The year 1998-99 has been a year of struggle in respect of operating and financial performance. However, that has not discouraged us and we have continued to contribute to the industrial and economic development of the nation. We have been able to achieve this with the guidance of the Hon'ble Prime Minister. He has encouraged us during moments of difficulty and has provided constructive help. The entire railway family is obliged to him for his constructive help.
I would like to thank all the railwaymen for their hard work and dedication to duty which has helped railways in achieving their task successfully. Our thanks are due to passengers and users of the railways whose cooperation we have always been getting and I am confident that this cooperation will be forthcoming in future too.
Sir, with these words I commend the Railway Budget 1999-2000 to the House.
![]() |