Print
XClose
Press Information Bureau
Government of India
Ministry of Road Transport & Highways
10-June-2016 12:15 IST
Status of National Highway Projects in Uttar Pradesh

·      In the State of Uttar Pradesh there are 60 National Highways with total length of 8483 Kms, out of which 4529 Kms are with NHAI and 3143 Kms with State PWD. NOC is awaited for 10 Nos NHs with 811 Kms.

·      8 Major Projects having a length of 865 Kms amounting to  Rs. 6218 Crs were completed in the past 2 years.

·      31 Major Projects are ongoing with a total length of 2156 Kms with total TPC of Rs. 19,436 Crs.

·      24 Major Projects were awarded during 2014-15 & 2015-16, with a total length of 1293 Kms and total TPC of Rs. 16,949 Crs

·      15 projects are likely to be awarded in the next 12 months with a length of 840 Kms with TPC of Rs.6790 Crs.

·      1400 Kms of National Highways are under DPR and Civil construction work likely to be awarded in the next  two years for approx cost of Rs. 14,000 Crs.

·      Under CRF and ISC Schemes a total number of 79 Projects have been sanctioned amounting to Rs. 3035 Crs during 2015-16 & 2016-17.

·      10 Number of new National Highways in the Uttar Pradesh state have been declared with a length of 811 Kms. (DPR invited by the Ministry)

·      35 Nos of NHs with 2591 Kms length have been approved ‘ in-principle ’, MORTH shall invest an amount of approximately Rs. 25,910 Crs to develop these National Highways, subject to the outcome of DPR / receipt of NOC from the State Govt

·      In totality, MORTH, through NHAI and State PWD, shall invest approximately an amount of Rs. 74,794 Crs  in the State in next two years.

The details of the above projects can be seen in the 13 tables that follow

 

Table 1 : Details of NHS in Uttar Pradesh

S. No.

Details of  NH

Length (Km)

i.

Total NH length (60 nos including newly declared NH)

8483

 

ii.

NH length entrusted to NHAI

4529

 

iii.

NH length entrusted to PWD

3143

 

iv.

Length of newly declared NHs but NOC from State PWD yet to be received (10 nos )

811

 

 

v.

Length of ‘In Principle’ approved National Highways. (35 nos)

2591

 

vi

Total length

11,074 Km

 

Table 2: Density of NHs

Sl. No.

NH density in respect of population and area

NH density

Uttar Pradesh

All India

(i)

Length (in Km./1000 Sq Km of area)

34.87                 (Area=243286 Sq Km)

28.25                 (Area=3287263 Sq Km)

(ii)

Length (in Km./Lakh of population) (As per 2011 Census)

4.25                 (Population=1996 Lakh)

7.67                 (Population=12102 Lakh)

 

Table 3: Lane distribution of entrusted NHs [7672 Km = 8483 – 811]

S.no

Lane Distribution

% age

 

i.

4 Lane and above

 

28%

ii.

2 Lane

 

69%

iii.

Less than 2 Lane

3%

 

 

Table 4: Details Of NH Works In The State Of Uttar Pradesh

S.No.

Programme / Plan

Total No. of Projects

Length in Kms

Total cost in Crores

1

Projects Awarded in 2014-15 & 2015-16

24

1293.29

16948.81

2

Projects completed during last 2 years

8

864.97

6217.39

 

Ongoing Major Projects

31

2156.87

19436.42

2

Projects in pipeline

15

839.72

6789.82

3

DPR under preparation

1400

14000

4

CRF & ISC likely to be awarded during 2016-17

79

1706.65

3035

5

New National Highways Declared

10

811

8110

6

National Highways declared  “In Principle”

35

2591

25910

 

Total Estimated / Projected investment in UP since May 2014.

 

8641.66

74793.63

 

Table 5: Major projects completed during last 2 years. Major Projects costing > Rs.100 Crs.

 

Sl. No.

NH

Work

Mode

Length

(in km)

TPC/ Civil Cost (Rs. In Cr)

Remark/Substantial completion

1

24B

4-laning of Lucknow-Raebareilly section

BOT (Annuity)

70

635

Completed in Jan, 2015

2

93

2 Laning with Paved Shoulder of Agra - Aligarh Section

BOT (Toll)

81.4

250

COD for 81.4 km issued in Aug, 2015

3

24

4 laning of Moradabad - Bareilly

BOT (Toll)

121

1267

COD for 118.8 km issued in Nov, 2015

4

93

4/6 laning of Ghaziabad – Aligarh

BOT (Toll)

126.3

1141

COD for 103.89 km issued in June, 2015

5

25

Unnao ROB and approaches of Lucknow Kanpur section

EPC

16.2

53.52

ROB completed and opened for traffic on 23, June, 2015

6

86

2 laning with paved shoulder of Kanpur – Kabrai Section

BOT (Toll)

123.86

373.47

COD for 123.86 km issued in July, 2015

7

2

6-laning of Etawah – Chakeri section BOT (Toll) mode

BOT (Toll)

160.21

1928

6-laning completed for 159.71 km in Sept, 15

8

231

2laning with PS of Raebareilly – Jaunpur on BOT Annuity mode.

BOT (Annuity)

166

569.4

Completed in Feb, 2016

 

 

Total

 

864.97

6217.39

 

TPC: Total Project Cost

COD: Commercial Operation Date.

 

Table 6 : Ongoing Major Projects: Physical and Financial progress

(a)          Projects under NHAI


Sl. No.

NH No.

Work

Length (km)

TPC/ Civil Cost

(Rs. Crore)

Date of Start

Stipulated Date of Completion

Status

(Present physical progress)

1

25

Jajmau Ganga Bridge to Rama Devi Crossing

5.46

201.66

Dec, 05

Dec, 08

94% in Progress

2

2&3

Construction of new 4 Lane Agra Bypass(EPC)

32.2

465.5

Jul, 11

Jul, 14

85% in progress

3

24

4-laining of Moradabad – Bareilly Section on BOT (Toll) mode

121

1267

Dec,10

June,13

98.6% in progress. (PCOD issued for length of 118.820 km.) Only 1.7 km remains to be completed. Delay to LA problem.

4

24

4-laning of Bareilly – Sitapur sec on BOT (Toll) mode

151.2

1046

March, 11

Aug, 13

44% in Progress

5

2

6-laning of Etawah – Chakeri section BOT (Toll) mode

160.21

1573

Mar, 13

Sep, 15

99% (6-laning work is completed and balance work viz service road, drains etc at few locations left due to slow progress in LA award)

6

91

Ghaziabad to Aligarh (Km 23.600 to Km 140.200) BOT (Toll) mode

126.30

1141

Feb, 11

Aug, 13

96%(PCOD issued for length 103.89km on 23.06.15

7

24B

2-laning with PS of Rbly – Allahabad section on BOT (Toll) mode

106.6

291.4

Jul, 12

Jan, 14

58% in progress

8

2

6-laning of Delhi – Agra section on BOT (Toll) mode

179.5

1928

Oct, 12

Apr, 15

51% in progress

9

232

2laning with PS of Tanda - Raebareilly on EPC Mode.

155

636

Apr, 14

Oct, 16

70% in progress

10

232

2laning with PS of Raebareilly - Banda on EPC Mode.

133

429

Apr, 14

Oct, 16

58% in progress

11

56,29

4-lane Varanasi Bypass (Phase-I) on EPC Mode.

16.55

 

261.00

May, 15

May, 17

20% in progress

12

233

4-laning of Ghaghra Bridge to Varanasi section from km 121.800 to km 180.420 [Package-I] on EPC mode.

58.64

674.34

Dec,15

May, 18

The contractor is mobilizing at the site and establishing camps and creating infrastructure to undertake the project.

13

233

4-laning of Ghaghra Bridge to Varanasi section of NH-233 from km 180.420 to km 240.340 [Package-II on EPC mode.

59.95

741

Jan, 16

June, 18

The contractor is mobilizing at the site and establishing camps and creating infrastructure to undertake the project.

14

233

4-laning of Ghaghra Bridge to Varanasi section of NH-233 from km 240.340 to km 299.350 [Package-III] on EPC mode.

59.07

785

Jan, 16

June, 18

The contractor is mobilizing at the site and establishing camps and creating infrastructure to undertake the project.

15

56

4-laning of Sultanpur to Varanasi section of NH-56 from km 134.700 (design chainage km 134.700) to km 205.000 (desing chainage km 209.230) [Package-I] on EPC mode.

74.53

986

Jan, 16

June, 18

The contractor is mobilizing at the site and establishing camps and creating infrastructure to undertake the project.

16

56

4-laning of Sultanpur to Varanasi section of NH-56 from km 205.000 (desing chainage km 209.230) to km 263.000 (design chainage 272.590) [Package-II] on EPC mode.

63.36

806

Jan, 16

June, 18

The contractor is mobilizing at the site and establishing camps and creating infrastructure to undertake the project.

 

 

Total

1502.57

13231.9

 

 

 

 

(b)          Projects under NHDP IV Zone of MORT&H

Sl. No.

NH. No.

Name of Project

Length (Km)

Agreement amount    (Rs. In cr.)

TPC in Crs

Date of    start

Length Completed till March 2016 (km)

Stipulated Date of Completion

Status

(Present physical progress)

1

29E

Gorakhpur-Ferenda-Nautanwa-Sonouli section 

81.41

441.00

569.34

19.03.15

45

Mar, 2017

50%

2

28C

Barabanki to junction with MDR-13 near Jarwal section  

43.00

272.70

358.47

19.03.15

31

Mar, 2017

68%

3

28C

Junction with MDR-13 near Jarwal to Bahraich bypass section 

50.00

261.00

337.58

28.10.14

50

April, 2016

99%

4

28C

Bahraich bypass to Rupaidiha section  

51.00

328.45

437.92

30.10.14

50

June, 2016

90%

5

233

Indo-Nepal Border to Rudhauli section  

65.87

393.08

551.48

26.06.15

0

June, 2017

5%

6

233

Rudhauli to Ghagra Bridge section 

56.40

397.50

550.93

25.03.17

30

Mar, 2017

25%

7

27

Allahabad to UP/MP Border section   

41.72

400.05

774.57

Yet to start

0

-

-

8

29E

Gorakhpur bypass from existing km 79.670 of NH-29E to existing km 251.700 of NH-28

18.25

531.00

531.00

Yet to start

0

-

-

407.65

3024.78

4111.29

 

206

 

 

 

(c)           Projects under Uttar Pradesh PWD & PIU of MORT&H

Sl. No

NH No.

Name of work

Length (km.)

Sanction Cost       ( Rs. Cr.)

Date of Start

Stipulated Date of Completion

Status (Physical completion /  likely completion by  )

1

96

Strengthening with provision of paved shoulder in km. 0.00 to 46.470 of NH-96(330) EPC MODE

46.47

227.74

23-2-13

May, 2016

92% / October, 2016

2

730

Widening & strengthening from km. 505.00 to 538.00 of NH-730 (EPC MODE).

33.00

207.88

29-2-16

Aug, 2017

Agreement signed on 15-5-15, Appointed date 29-2-2016.

3

730

Widening & strengthening from km. 454.00 to 470.90, 474.00 to 484.00 of NH-730 EPC MODE

26.90

138.44

03-2-16

Feb, 2018

Agreement signed on 13-8-15, Appointed date 03-2-2016

4

730A

Widening to two lane carriageway with paved shoulder and strengthening from Km.0.00 to 50.675 of NH-730A (EPC mode)

50.675

164.54

28-2-14

Dec, 2016

35%/ Dec, 2016 – Notice for imposing LD issued.

5

Eastern side of NH-24B

Construction of Ring Road for Raebareli city (Phase-I) on Eastern Side of NH-24B

17.93

302.73

04.03.2014

July,2017

The contractor has promised to complete the work by 31.07.2017.

6

56

Four laning of Babatpur-Varanasi section of NH-56 (231) Km 263.00 to 280.25 (EPC MODE)

17.25

753.57

15-9-15

Sept, 2017

Physical progress is 11.25%. Likely date of completion September, 2017.

7

730A

Widening to two lane with paved shoulder from Km.51.000 (50.675) to 105.500 of NH-730A on EPC mode

54.43

298.33

Yet to start

-

LOA issued on 16-5-2016. Agreement yet to be signed and appointed date to be notified.

 

 

Total

246.655

2093.23

 

 

 

 

Table 7 : Projects awarded in 2014-15 & 2015-16:

Sl No

Name of the Project

Length (km)

 Cost (TPC in Crore)

NH(O) Projects executed by State PWD

1

Widening with Paved shoulders & Strengthening from Km.0.00 to 50.675 of NH-730A EPC MODE

50.675

164.54

2

Strengthening with provision of paved shoulder in km. 0.00 to 46.470 of NH-96(330) EPC MODE

46.47

227.74

3

Widening & strengthening from km.505.00 to 538.00 of NH-730 (EPC MODE)

33.00

207.88

4

Widening & strengthening from km. 454.00 to 470.90, 474.00 to 484.00 of NH-730 EPC MODE

26.90

138.44

5

Constn. for four laning of Babatpur-Varanasi section of NH-56 (231) Km 263.00 to 280.25 (EPC MODE)

17.25

753.57

6

Construction of Ring Road for  Raebareli City (Phase -I) on Eastern side of NH 24B

17.927

302.73

7

Widening to two lane with paved shoulder from Km.51.000 (50.675) to 105.500 of NH-730A on EPC mode

54.43

298.33

 

 Sub-total A

246.652

2093.23

NHDP-IV executed by state PWD

8

Barabanki to junction with MDR 13 near Jarwal section of NH-28C in Uttar Pradesh km 0 to 43

42.45

358.47

9

Junction with MDR-13 near Jarwal to Bahraich section of NH-28C in Uttar Pradesh km 43 to 93

50.49

337.58

10

Bahraich bypass to Rupaidha section NH-28C in Uttar Pradesh km 99 to150

53.85

437.92

11

Sonouli to Gorakhpur section of NH-29E in Uttar Pradesh km 0/0 to 80/0

81.412

569.34

12

Indo-Nepal Border to Rudhauli section of NH-233 in Uttar Pradesh km 0/0 to 65/870

65.87

551.48

13

Rudhauli to Ghagra Bridge section of NH-233 in Uttar Pradesh km 65/870 to 122/270

54.36

550.93

14

Four laning of Allahabad to UP/MP Border section of NH-27  

41.34

774.57

15

Gorakhpur bypass from existing km 79.670 of NH-29E to existing km 251.700 of NH-28

18.25

531

 

Sub-total B

408.022

4111.29

NHDP-IV executed by NHAI

16

Construction of 4-lane Varanasi Bypass connecting NH-29 and NH-56 (Phase-I) on EPC Mode.

16.550

261.00

17

4-laning of Ghaghara Bridge to Varanasi section from km 121.800 to km 180.420 (Pkg-I) on EPC Mode.

58.635

674.34

18

4-laning of Ghaghara Bridge to Varanasi section from km 180.420 to km 240.340 (Pkg-II) on EPC Mode.

59.947

741.00

19

4-laning of Ghaghara Bridge to Varanasi section from km 240.340 to km 299.350 (Pkg-III) on EPC Mode.

59.070

785.00

20

6 laning of Agra to Etawah Bypass section from km 199.660 to km 323.525 on BOT (Toll)

124.520

1650.20

21

4-laning of Sultanpur to Varanasi section of NH-56 from km 134.700 to km 205.000 (Design Ch. 209.230) (PKG-1) on EPC Mode.

74.53

986.000

22

4-laning of Sultanpur to Varanasi section of NH-56 from km km 205.000 to km 263.000 (Design Ch. 272.590) (PKG-2) on EPC Mode.

63.36

806.000

23

6-lane Eastern Peripheral Expressway around Delhi

135

3991.43

24

Construction of Delhi – Meerut Expressway

45

849.32

 

Sub-total C

636.612

10744.29

 

Total (A+B+C)

1293.29

16948.81

 

Table 8: Projects in pipeline:

Sl No

Name of the Project

Length (km)

 Cost (TPC in Crore)

NH(O) Projects executed by State PWD

1

Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from Km.51.000 (50.675) to 105.000 of NH-730A

54.43

298.33

2

Rehabilitation and Up-gradation of Bahraich-Shrawasti section (Km.248.40 to 310.00) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder on EPC mode

61.90

388.83

3

Rehabilitation and Up-gradation of Harpalpur - Sugira section (Km.89.600 to 133.520) of NH-76 (New NH No.339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode

41.47

208.50

4

Rehabilitation and Up-gradation of from Km.285.000 to 326.000 of NH-76 (Kalupur-Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh

41.25

240.30

5

Rehabilitation and Up-gradation of Lakhimpur -Sisiya section (Km.140.00 to 188.80) of NH-730  to two lanes with paved shoulder on EPC mode in the State of Uttar Pradesh

48.80

296.50

6

Rehabilitation and Up-gradation of Sultanpur - Pratapgarh section of NH-96 from existing km 60/000 to km 90/000 [Design Ch. 60.000 to Ch. 90.865] to Two lane with paved shoulders on EPC mode in the state of Uttar Pradesh

30.87

208.88

7

Rehabilitation and Up-gradation of Tulsipur- Barhani Section (Km 351+000 to Km 385+000) of NH-730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh

34.00

249.50

8

Rehabilitation and Up-gradation of Sisiya-Nanpara section (Km.188.8 to 226.100) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode

37.46

213.51

9

Rehabilitation and Up-gradation of Pratapgarh to Allahabad Bypass road junction section of NH-96 from existing km 100+800 to km 135+230 [Design Ch.100+800 to Ch. 135+500] to four lanes with paved shoulders on EPC mode in the state of Uttar Pradesh

34.70

599.34

10

Rehabilitation and Up-gradation of Puranpur - Khutar section (Km38.000 to 82.000) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode

44.13

225.96

 

Sub-total A

429.01

2929.65

11

Aligarh-Moradabad

146.37

503.34

12

Meerut - Buldandshar

61.19

609.72

13

Varansi-Gorakhpur (Pkg-II)

72.15

856.64

14

Varansi-Gorakhpur (Pkg-III)

65.38

852.32

15

Varansi-Gorakhpur (Pkg-IV)

65.62

1038.15

 

Sub-total A

410.71

3860.17

 

TOTAL

839.72

6789.82

 

Table 9 :DPR Under Preparation:

Sl No

Name of the Project

Length (km)

 Cost (TPC in Crore)

NH(O) Projects executed by State PWD

1

DPR of remaining stretches of NH-76, NH-730, NH-330A, NH-19, NH-119

700

7000

NHDP-IV executed by NHAI

2

4-laning of Aligarh-Kanpur section of NH-91 under NHDP Phase-IV on BOT (Toll) mode

282 km

3

Lucknow Ring Road under NHDP Phase-VII

100 km

4

Varanasi Ring Road (Phase-II) under Phase-VII

43 km

 

5

2-laning with paved shoulders of Varanasi-Hanumanha section of NH-7 under NHDP Phase-IV on EPC mode

125 km

 

6

6-laning of Hapur bypass-Moradabad section of NH-24 under NHDP phase-V

100 km

 

7

2-laning with paved shoulders of Unnao-Lalganj section of NH-232A under NHDP Phase-IV on BOT (Annuity) mode

50 km

 

 

 

700

7000

 

Total

1400

14000

 

Table 10 : List of CRF works:

Sl No

Name of the proposal

Length in Km.

Modified cost by Ministry

1.

Widening and strengthening OF Kairana-Khatauli road from Km.33.000 to 47.900 (MDR)

14.90

28.31

2.

Bhitaura- bahedi road (ODR) from Km 1.000 to 42.800, comprising of widening and strengthening work from 3.75 m to 7 m (two laning).

41.80

77.93

3.

Sishgarh-bahedi road(ODR) from km 1 to 20, comprising of widening and strengthening work from 3.75 m to 7 m (two laning)

20.00

36.68

4

Widening and strengthening of  Baha-Udi road from Km.22 to 30

9.000

18.83

5

Widening and strengthening of  Udi-Chakarnagar-Bareh road

42.300

94.40

6

Widening and strengthening of  Barkheda-Daolatpur-Uganpur-Suhas road from Km 0.000 to 20.650

20.650

48.08

7

Strengthening of  Gawan -Anupshahar  road from Km 0.000 to 9.390

9.390

12.24

8

Widening and strengthening of  Widening & Strengthening of Babrala-Anupshahar road from Km 0.00 to Km 16.630

16.630

14.48

9

Widening & Strengthening of Rajpura-Tikata-Bahjoi road from Km 0.00 to 24.800

24.800

36.32

10

Widening & Strengthening of link road connecting Km 193 of NH-93 (Chandausi) via Ata-Mauassu-Naglia ballu-Tharaisa Jai Singh up to Pawasa from Km 0.00 to 17.00

17.000

26.75

11

Widening & Strengthening of road connecting Km 158 of Meerut Badaun road to Mithunpur via Ghonsli raja (Km 0.00 to Km 11.850)

11.850

20.14

12

Widening & Strengthening of link road from Sahaswan Nadha to Pathakpur via Ghari Khanpur  from Km. 0.00 to 8.000

8.000

14.84

13

Widening & Strengthening of Kanth - Mishripur - Begampur - Karanpur - Rattupura - Thakurdwara - Jaspur Road (KMBK road from Km 0.000 to 13.600, KRSJ road from Km1.000 to 8.000, TR road from Km 1.000 to 8.000 and TJ road from Km 0.000 to 5.000).

33.700

67.80

14

Widening & Strengthening of Dalpatpur - Aliganj from Km 0.000 to 42.000

42.000

64.27

15

Widening & Strengthening of Bisalpur - Bilsanda Gola road   from Km 1.580to 21.000.

19.580

21.78

16

Widening & Strengthening of Nawabganj - Dalelnagar- Vaharjagit- Barkheda road           ( Barkheda-Nawabganj road)    from Km 16.000 to 19.750

3.750

10.02

17

Widening of Bisauli- Aonla road   from Km.0.000 to 14.000

14.000

12.39

18

Widening & Strengthening from Gandinagar Jamo road to Jodhnapur Madka via Barouliya

6.575

8.64

19

Strengthening of Jais - Mohanganj road from Km 0.000 to 17.000

17.000

22.57

20

Strengthening of road from Varisganj to Devkali Chauraha via Raniganj from Km 0.000 to 10.000)  ( Varisganj-Shukulbazar-Subeha road)

10.000

11.09

21

Strengthening from road Km 2 of Sourikh-Daulatabad road to Behatarampur –Kairda Vishungad road (Km 0.00 to 10.00)

10.000

20.93

22

Widening & Strengthening of Raebareli-Gurubakshganj-Kheri-Semri road from Km 5.800 to Km  to 42.300

36.500

68.52

23

Widening & Strengthening of Lalganj-Semarpaha-Ralpur road Km 7.00 to 19.600

12.600

19.73

24

Widening & Strengthening of remaining portion of Raebareli-Dalmau-Fatehpur road (Km 0.00 to Km 2.953)

2.953

3.12

25

Widening & Strengthening of Dalmau-Jagatpur road from Km 3.600 to Km 26.000

22.400

35.65

26

Widening & Strengthening of Jahanabad Richa road from Km. 0.00 to 10.000

10.000

14.62

27

Widening & Strengthening of Puranpur Diyoriya Kalan road  from Km. 30.00 to 44.720)

14.720

33.03

28

Widening & Strengthening of Bareilly Bisalpur road from Km 26.000 to Km 40.800

14.800

27.97

29

Strengthening of Bilraya-Panwari road from Km 288.00 to Km 311.650

23.650

36.53

30

Strengthening of  Muradganj-Ayana-Bijhalpur road (Km 0.00 to 10.00)

13.700

26.39

31

Widening & Strengthening of Biswan-Laharpur-Hargaon road from Km 0.000 to Km 27.200

27.200

56.68

32

Widening & Strengthening of Biswa – Mahmuda road from Km 0.000 to 24.830

24.830

56.39

33

Widening & Strengthening of Lalitpur - Mehrauni road from Km 5.360 to 21.000 and from Km 35.500 to 42.000

22.140

41.48

34

Widening & Strengthening of Jhansi-Unnao-Balaji road from Km 0.000 to 10.900, which starts from Km 5 of NH-75

10.900

18.62

35

Widening & Strengthening of  Jalalpur- Rampur -Bhagan- Tarun Aahirouli road from Km 0.000 to 22.350

22.350

37.11

36

Widening & Strengthening of Bisalpur Banda Puwayan Khutar road from Km 21.000 to 32.200

11.20

22.67

37

Widening & Strengthening of Amroha ring road / bypass from Km 0.00 to Km 35.775

35.775

53.52

38

Widening & Strengthening of Chunahar Jamui Aaharora road from Km 1.00 to 20.325

19.025

43.65

39

Widening and strengthening of  Nawabganj - Dalelnagar-Baherjageer road from Km 0.000 to 16.000

16.000

27.82

40

Widening and strengthening of  Inayatpur - Ghopa (Fulaona) link road

12.200

10.47

41

Widening and strengthening of Birsingh – Halapur link road

17.050

18.90

42

Widening and strengthening of  road in Lambua via Kothra Hagiganj, Rajumari to Tatomureni from  Km. 0.00 to 15.500

15.500

23.60

43

Widening and Strengthening from  Aligarh Ramghat road to Gaonkheda Godha CTK road from Km 0.00 to Km 15.300

15.300

29.44

44

Strengthening & widening of   Vidhnu-Kisan Nagar Nehar Patri road from Km 1.000 to 18.600

17.600

24.67

45

Wideing and Strengthening of  Chibramau-Kairda road Km.0.000 to 9.800

9.800

21.26

46

Widening and Strengthening of Lalitpur - Devgarh road from Km 0.000 to 32.300

32.300

53.77

47

Widening and Strengthening of Jakhora - Rajghat road from Km 0.000 to 19.000

19.000

35.31

48

Widening and Strengthening of Lalitpur - Rajghat road from Km 0.000 to 21.560

21.560

37.82

49

Widening and Strengthening of Karahi to Pathra via Goura-Tigodwa from Km 0.000 to 9.000

9.00

4.13

50

Widening and Strengthening of Baansi Ganguli Chauraha to Gothwa Ghat via Piperhiya from Km 0.000 to 5.000

5.000

2.36

51

Strengthening of Chilaha- Gopiganj road Km 0.00 to 10.40

10.400

14.31

52

Widening & Strengthening of link road connecting NH-509 at Narora via  Jamuna singh road-Ishampur-Asadpur-Dabathra with State Road 18 (Junawa)  (Km 0.00 to 13.100)

13.100

23.94

53

Widening and Strengthening of Gorakhpur- Pipraich- Kaptanganj road from Km 0.000 to 19.485

19.485

36.78

54

Widening and Strengthening of Sahajanwan - Bakhira road from Km 0.000 to 23.200

23.200

60.02

55

Pipiganj - Jasval - Sisai - Sahjanwan road from Km 0.000 to 20.200

20.200

28.36

56

Four laning of interna lportion of old NH-2 from Km 161.800 to 180.000 (Kokhraj to Manauri)

18.200

127.32

57

Strengthening of city protionof old NH-93  handed over to State PWD from Umed to Nagla Bhus from Km 0.000 to 10.635

10.635

20.86

58

Widening and Strengthening of Agra-Jalesar-Sikandramau road from Km 62.000 to 74.4000

10.700

18.06

59

Widening and Strengthening of Bhojubir-Sindhora road from  Km 2.00 to 23.200

21.200

46.77

60

Widening and Strengthening of link road connecting NH-11 to NH-2 at (Achnera Deen Dayal Dham Farah road)

Kirvali-Achnera-(Km 4.65 to 6.65)

Achnera-Zhundavai (Km 0.00 to Km 1.70)

Achnera-Farah (Km 0.00 to Km 1.70 & Km 1.70 to Km 9.025)

Farah-Achnera (Km 0.60 to Km 8.20)

Farah-Shonkh (Km 0.00 to 0.60)

20.925

41.44

61

Widening & Strengthening of Mau to Mohmmadabad road via Yousufpur  (Km 0.00 to Km 10.000)

10.000

24.70

62

Widening of BTIB to Mahowa Dhobha Shahapur road (Km 0.000 to Km 18.000

18.000

27.25

63

Widening & Strengthening of Shoharatgarh to Palta Devi lin road  via Ramwapur Chouraha

5.000

2.12

64

Widening & Strengthening of Jaunpur-Malhani-Khuthan road (Km 0.00 to Km 27.150)

27.150

32.02

65

Widening & Strengthening of Kundaha-Sujanganj-MachliShehar-Madiyahoo-Jalalpur-Kerakat-Sultanpur road (Km 0.00 to 27.080 & Km 87.500 to 96.200)

36.080

45.98

66

Widening & Strengthening of Jivli -Devgaon -Mehnajpur -Aodiyar road (Km 18.440 to Km 33.500)

15.060

15.23

67

Widening & Strengthening of road from Babatpur-Chaubepur-Bhagtua-Balua bridge (Km. 32.340 to 61.13)

39.350

93.28

68

Widening & Strengthening of Baburi-Dharauli road (Km 0.00 to 15.00)

15.000

34.60

69

Widening & Strengthening of Chahaniya-Dhanapur-Mahuji-Jamaniya road

42.000

76.59

70

Widening & Strengthening of Lalapur Imliya Kanjasa Bhita road (Km 0.00 to Km 23.600)

23.600

32.66

71

Widening & Strengthening of Pailani-Galauli-Bara road (Km 0.00 to 15.00)

15.000

27.52

72

Widening & Strengthening of Kaptanganj-Siswan-Nichlaul-Thuthiwari-Nautanwa

73.000

189.89

73

Widening & Strengthening of Aligarh to Gonda road (Km 0.00 to Km 18.200

16.200

27.01

74

Widening & Strengthening of Gazi ka bagh Mubarakpur link road (Km 0.00 to Km 13.600)

13.600

17.97

75

Widening & Strengthening of SMK road to lutar khaur bhaiyya Laxman ka Pura-Meja-Bhatauti road (Km 0.000 to Km 19.250)

19.25

44.54

76

Widening & Strengthening Delhupur-Raniganj-Patti Kohdaur road (Km 0.000 to Km 61.000)

61.00

117.64

 

            Sub-total

1505.313

2780.58

 

ISC Works

 

 

1

Widening of existing single lane carriageway to two lanes with Strengthening from Km.0.00 to Km 49.00of  LalganjHaliyaAndawaManigaraha Road (ODR)  upto Madhya Pradesh Border

49.00

98.97

2

Widening of existing single lane carriageway to two lanes Km. 2.50 to Km 36.24 and with two lane paved shoulder from Km. 0.00 to Km 2.50 with Strengthening from Km.0.00 to Km 36.24 of Chopan to MP Border Road (ODR)

36.24

96.05

3

Widening of existing carriageway to two lanes with paved shoulder with Strengthening from Km.0.00 to Km 15.43 of BhabniPokharaAasandeeh Road (ODR) of Distt. Sonebhadrain

15.43

59.42

 

Sub-total

100.67

254.44

 

Total

1706.653

3035

 

Table 11: New National Highways Declared

S N

NH No

Name of Highway

Length in Km

Date of Declaration

1

123

Dholpur to Bharatpur

15

13.8.2011

2

330

Allahabad-Pratapgarh-Sultanpur-Faizabad-Ayodhya-Nawabganj-Gonda-terminating at NH-730 near Balrampur (Portion from Ayodhya to Balramapur via Gonda)

96

31-07-2013

3

334A

Purkaji – Laksar – Haridwar road

15

26.02.2014

4

334B New

Meerut - Haryana Border

60

04.03.2014

5

219 New

Bihar Border- Chandauli (NH-19)

5

04.03.2014

6

709A

Haryana Border- Shamli- Budhana- Meerut (NH-34)

94

10.03.2015

7

727A

Gorakhpur (NH-27)- Deoria- Salempur- Bihar Border

100

10.03.2015

8

227A

Ayodhya (NH-27)- Chhawni- Kalwadi- Barhalganj- Barhaj- Bihar Border

218

10.03.2015

9

731A

Near Pratapgarh (NH-31)- Jethwada- Shrangverpur- Manjhanpur- Rajapur- Near Chitrakoot (NH-35)

160

10.03.2015

10

330B

Near Gonda (NH-330)- Near Jaewal (NH-927)

48

10.03.2015

 

TOTAL

811

 

Table 12 : National Highways declared  ‘In Principle’:

Sl. No.

Name of Highway / road

Length in U.P. (in Kms)

1

Allahabad-Jaunpur-Gorakhpur

170.00

2

Panipat- Haryan / UP border - Shamli-Muzaffarnagar-Bijnor-Nagina

131.00

3

Delhi- Saharanpur

170.00

4

Ghaziabad-Noida-Faridabad-Sohna (Total length= 75 km; Haryana= 57 km; UP= 18 km)

18.00

5

<