Releases Hindi Releases Urdu Releases Photos Invitations Features Hindi Features Accreditation RSS Feedback Subscribe Releases Search Advance Search
Quick Search
home Home
home  Printer friendly Page home  Email this page
English Release 19-June 2013
Date Month Year
  • Presidents Secretariat
  • President of India to visit Tripura from June 20 to 21
  • Prime Minister's Office
  • PM announces 1000 crore rupee disaster relief for Uttarakhand
  • PM congratulates President-elect Rowhani of Iran
  • Min of Comm. & Information Technology
  • Extension of time for receiving comments on draft amendments to the Interconnection Regulations applicable for Digital Addressable Cable Television Systems (DAS) and Tariff Order applicable for all addressable systems
  • Min of Consumer Affairs, Food & Public Distribution
  • National Consumer Helpline Records 12,704 Calls in may, 2013
  • Min of Defence
  • Armed Forces Mount Massive Relief Operations in Uttarakhand and Himachal
  • Ministry of Finance
  • Government Approves 1 Proposal of Foreign Direct Investment Amounting to About Rs.7.00 Crore
  • India and World Bank Sign Us$ 216 Million Agreement for Kerala State Transport Project
  • Min of Health and Family Welfare
  • Smt. Santosh Chowdhary takes over as Minister of State for Health and Family Welfare
  • Min of Human Resource Development
  • MoS for HRD Shri Jitin Prasada visits Seoul International Book Fair (SIBF) 2013
  • HRD Ministry to Strengthen Monitoring System of Mid Day Meal Scheme
  • Min of Petroleum & Natural Gas
  • MoPNG rebuts allegations regarding KG D-6 Field
  • International crude oil price of Indian Basket declines to 103.20/US$ bbl on 18.6.2013
  • Ministry of Railways
  • Commodity-Wise Freight Revenue by Railways Goes up by 8.66 Per Cent During April-May 2013
  • Shri Mallikarjun Kharge Takes Over as Minister of Railways
  • Min of Shipping
  • Jawaharlal Nehru Port Trust Signs Concession Agreement with M/s. Nhava Sheva (India) Gateway Terminal Pvt. Ltd
  • Min of Textiles
  • K S Rao Takes Charge as New Textiles Minister
  • Ministry of Tourism
  • Tourism Minister Announces New Campaign to Promote Himalayas

Previous Date

 
Ministry of Defence03-May, 2010 16:18 IST
Restructuring Of DRDO
The Government has appointed a committee headed by Defence Secretary to examine the views of the stakeholders on the recommend

The Government has appointed a committee headed by Defence Secretary to examine the views of the stakeholders on the recommendations of Dr. P Rama Rao Committee. The Committee is in the process of finalising its report.

 

            The details of major ongoing DRDO projects, which are yet to be completed with technologies / products developed during the last ten years is given below:

Major DRDO Projects / Programmes which are yet to be completed

No.

Name of the Project / Programme

Date of Sanction

Original Probable Date of Completion (PDC)

Revised PDC

Technologies / Products developed and status of Projects / Programmes

1.

Light Combat Aircraft (LCA), Full scale Engineering Development (FSED) Programme – Phase – II

20 Nov 2001

31 Dec 2008

31 Dec 2012

More than 1330 flight tests have been completed utilizing 8 Tejas Aircraft. Maiden flight of the first two seater (trainer) version Prototype Vehicle (PV5) – Tejas carried out. Air – to ground weapon drop, air to air close combat missile release, sea level trials, cold weather trials, night flying trials and crosswind take off and landing have been completed successfully.

2.

Full Scale Engineering Development (FSED) Programme of Naval Light Combat Aircraft (LCA-Navy)

28 Mar 2003

27 Mar 2010

27 Dec 2014

Equipping of LCA (NP-1) fuselage is in progress.

3.

Interception, Monitoring, Direction and Finding and Analysis System (IMDFAS)-Divyadrishti

27 Aug 2002

26 Feb 2008

26 Aug 2010

Limited integration configuration demonstration has been completed at production agency site successfully and ten stations have been installed at designated sites so far.

4.

Integrated Guided Missile Development Programme (IGMDP)

26 Jul 1983

30 Jul 1995

31 Dec 2010 (Projects for development of Prithvi, Agni, Dhanush, Aakash and Trishul missiles have been completed, whereas PDC for only Nag missile has been extended upto Dec 2010)

Prithvi, Agni and Dhanush missiles have been inducted into Services whereas, Akash missile system is scheduled to be inducted in 2012 and user trials of Nag missile has been completed. Development of Trishul missile has been completed as Technology Demonstrator.

5.

Kaveri Engine for LCA

30 Mar 1989

31 Dec 1996

31 Dec 2010

About 1880 hrs on engine test has been completed on various prototypes of Kaveri Engine. A total of eight Kaveri Engines and four core engines have been manufactured, assembled and tested. High Altitude testing on core engine has been completed successfully.

 

            Funds allocated and utilized by DRDO during the last three years is given below:-

 

Year

2007-08

2008-09

2009-10

Allocation

(Rs. in crore)

6256.81

7737.64

8317.27

Percentage of utilisation of Budget

97.57

99.44*

97.68#

            *Based on CGDA 15th corrections.

            # upto March (pre) CGDA.

 

            DRDO has inducted 523, 625 and 754 scientists during the year 2007, 2008 and 2009, respectively.

 

            The following steps have been taken to strengthen the organisation:

 

(i)                   Consortium approach has been used for design, development and fabrication of critical components.

(ii)                 Three-tier project monitoring approach is being followed in the major projects / programmes.

(iii)                Project Monitoring Review Committee (PMRC); and Project Appraisal and Review Committee (PARC) meetings are held regularly to monitor the progress of the ongoing projects.

(iv)                Concurrent engineering approach has been adopted in technology intensive projects to minimize time-lag between development and productionisation of the systems, and Information Technology and modern management techniques have been applied.

(v)                  Participation of Services in all major programmes right from the beginning of the projects, etc.

(vi)                Large number of R&D projects and research initiatives taken up with nearly 100 academic and other scientific establishments.

There are also international collaboration to fortify DRDO’s strength.

 

            This information was given by Defence Minister Shri AK Antony in a written reply to Shri Mangani Lal Mandal and others in Lok Sabha today.

 

Samir / RAJ

 


(Release ID :61315)

Web Ratana This site is winner of Platinum Icon for 'Outstanding Web Content' Web Ratna Award'09 presented in April 2010
Site is designed and hosted by National Informatics Centre (NIC),Information is provided and updated by Press Information Bureau
"A" - Wing, Shastri Bhawan, Dr. Rajendra Prasad Road, New Delhi - 110 001 Phone 23389338
Go Top Top

Terms of Use Copyright Policy Privacy Policy Hyperlinking Policy उपयोग संबंधी शर्तें स्वोत्वाधिकार नीति गोपनीयता संबंधी नीति हाइपरलिंकिंग नीति