Central Government has allocated funds to Jharkhand for development and improvement of National Highways during the last three years as follows:

 

S No

Year

Fund Allocated (Cr)

Developement

Repair & Maintenance

1

2013-14

112

51.97

2

2014-15

119

59.99

3

2015-16

38.08

104.19

 

 

The details regarding length of each National Highway in Jharkhand and the length of roads which are in poor condition, as compared to the standards of maintenance are given as below:

 

 

Details of National Highways and their status in Jharkhand Projects in 2016-17

  

 

Sl No

NH No

Route of the National Highway

Length in Km

Status of the road

With NHAI

With RCD JH

Total

1

2

Chauparan(Bihar Border) to Chirkunda(WB Border)

192.26

0

192.26

The stretch has been developed to a 4-lane facility under NHDP-I (GQ).Development to 6 Lane under NHDP-V is under progress

2

6

W-B border to Orissa Border.

16.30

6.1

22.4

The 16.30 Km stretch entrusted to NHAI is being developed to 4 lane under NHDP Phase III. The balance 6.1 Km is being maintained by state RCD. Entire 22.4 Km is 2-laned.

3

23

Chas(Bokaro) to Ramgarh Ranchi- Gumla-Birmitrapur.

78.19

215.87

294.06

The development of the stretch is under progress under NHDP-IV. 14.5 Km DBM has been completed

4

31

Barhi to Koderma.

0

47.7

47.7

The entire stretch is 2- laned. Feasibility study completed in September, 2014 by NHAI for the development of the stretch under NHDP-IV. Presently the maintenance is with RCD Jharkhand.

5

32

Govindpur- Dhanbad- Chas-Purulia-Chandil-Mango-Pardih link.

93.50

0

93.50

The stretch has been recently entrusted to NHAI on 05.10.2015. The project proposal is under preparation. The overall condition of the stretch is good.

6

33

Barhi- Hazaribaagh-Ranchi-Jamshedpur-Bahragora

333.5

0

333.5

The entire stretch has been entrusted to NHAI. It is being developed into 4-lane under NHDP-III.

7

43

Chaibasa – Saraikela- Chandil

0

64.5

64.5

This is a newly declared NH. The entire stretch is 2-laned. Maintenance of the stretch is with RCD Jharkhand.

8

75

Renukut-Nagarutari-Garhwa- Parwa More Daltonganj-Ranchi.

0

259.0

259.0

Under LWE, work has been completed in 59 Km. Following are the stretches: Km 86.0 to Km 118.0, Km 138.0 to Km 146.0 and Km 150.0 to Km 169.0 of NH-75.

Work is in progress in Km 182.0 to Km 259.725 of NH-75, i.e 77.725 Km

Widening/Strengthening to 2-laned with paved shoulder from Km 0.0 to Km 34 (34 Km) has been proposed in Annual Plan 2015-16.

9

75-Ext

Khunti- Murhu-Chakradharpur-Chaibasa-Jaitgarh (Ranchi to Jaitgarh is NH-75 E)

0

203.90

203.90

Widening/Strengthening from Km 129 to Km 142 (13 Km) of NH-75(E) has been completed.

Under LWE 42.82 Km has been completed. Following are the stretches: Km 142.0 to Km 176.0, Km 0.0 to Km 7.77 and Km 14.70 to Km 15.75 of NH-75(E),

10

78

Jashpurnagar-Gumla

0

23.21

23.21

The entire stretch is 2-laned. The maintenance of the stretch is with RCD Jharkhand.

11

80

Mirzachowki-Rajmahal-Farakka

0

93.90

93.90

IRQP from Km 210.5 to Km 225 was sanctioned in 2012. Bidding has been stopped due to non-responsiveness of bidders. Hon’ble MP has been appraised about the matter.

44.4 Km of the stretch is 2 laned, 34.50 Km is intermediate laned and 14.0 Km is single laned. The DPR for the development as 2 lane with paved shoulder is in progress.

Stretch (244 to 260 km are in poor condition)

12

98

Hariharganj-Amba- Chhatrapur-Parwa More

0

55.4

55.4

Widening/strengthening from Km 25.6 to Km 79.147 has been completed under LWE in 2012-13. The entire stretch is 2 laned.

13

99

Dobhi- Chatra- Balumath- Chandwa.

0

106.0

106.0

Widening/strengthening to 2-lane with paved shoulder from Km 31.0 to Km 61.0 is under tender evaluation.

Under LWE, widening/strengthening from Km 61.00 to Km 79.20 and from Km 79.20 to Km 117.175 (total 56.175 Km).

Work is in progress in Km 11.20 to Km 30.00 (18.80 Km)

14

100

Chatra-Simaria- Hazaribaagh-Bishnugarh- Bagodar.

0

120.0

120.0

Under LWE, widening/strengthening from Km 21 to Km 39, Km 74 to Km 101.30 and Km 101.30 to Km 119.175 have been completed (total 63.175 Km).

Work is in progress in Km 0 to Km 21 and in Km 62.65 to Km 73.00 (total 31.35 Km)

15

114A

West Bengal/Jharkhand Border – Sikaripara – Dumka – Lakrapahari – Jama – Jarmundi – Choupa More – Deoghar – Sarath – Madhupur – Giridih – Dumri

0

298.0

298.0

Widening/strengthening to 2 lane with paved shoulder from Km 216.00 to Km 244.48 is in progress.

175.6 Km of the stretch is 2-laned and 122.4 Km is intermediate laned.

This is a newly declared NH entrusted to RCD Jharkhand on 23.03.2013.

Stretch (147 to 171 km are in poor condition)

16

133

Bihar/Jharkhand Border to Chopa More

0

139.0

139.0

Widening/strengthening to 2 lane with paved shoulder from Km 94.00 to Km 131.00 is in progress.

85.12 Km of the stretch is 2-laned and 53.88 Km is intermediate laned.

This is a newly declared NH entrusted to RCD Jharkhand on 23.09.2014.

Stretch (62 to 82 km are in poor condition)

17

133A

Pakur – Baharwa

0

42.0

42.0

The entire stretch is 2-laned.The maintenance of this stretch is with RCD Jharkhand.

This is a newly declared NH entrusted to RCD Jharkhand on 23.09.2014.

Stretch (0 to 12.80 km are in poor condition)

18

143A

Kuku-Gumla

0

71.0

71.0

45.0 Km is Intermediate laned and 26.0 Km is 2-laned. The maintenance of this stretch is with RCD Jharkhand.

This is a newly declared NH entrusted to RCD Jharkhand on 23.09.2014

19

220

Chaibasa-Hata-Jamshedpur

0

54.0

54.0

The entire stretch is two laned. PR/IRQP work from Km 41.0 to Km 54.20 was sanctioned in February 2015.

This is a newly declared NH entrusted to RCD Jharkhand on 31.05.2013

20

333

Bihar/Jharkhand Border – Deoghar

0

20.0

20.0

The entire stretch is 2-laned. The maintenance of this stretch is with RCD Jharkhand.

This is a newly declared NH entrusted to RCD Jharkhand on 22.03.2013

21

333A

Godda – Bihar/Jharkhand Border

0

12.5

12.5

The entire stretch is 2-laned. The maintenance of this stretch is with RCD Jharkhand.

This is a newly declared NH entrusted to RCD Jharkhand on 23.09.2014

22

343

Chhattishgarh/Jharkhand Border – Garhwa

0

47.0

47.0

Widening/strengthening to 2 lane with paved shoulder of the entire stretch has been proposed in Annual Plan 2015-16.

The entire stretch is 2 laned.

23

419

Kulti – Jamtara-Gobindpur

0

58.0

58.0

Widening/strengthening to 2 lane with paved shoulder of the entire stretch has been proposed in Annual Plan 2015-16.

21.5 Km of the stretch is single laned and 36.5 Km is two laned.

This is a newly declared NH entrusted to RCD Jharkhand on 23.09.2014

24

133B

Sahibganj-Bihar Border

0

11.0

11.0

This is a newly declared NH entrusted to RCD Jharkhand

 

 

The NH-2 from Chordaha (Bihar/ Jharkhand Border) to Barwa Adda is presently 4-laned. The work for 6-laning of this stretch has yet not been awarded and the project proposal is under restructuring. In this portion of NH-2, no issue of unstable land has been noticed during the feasibility study of the project.

 

Regular Meetings of Infrastructure Committee headed by Minister for Shipping, Road Transport & Highways are being taken to speed up the delayed and revive the languishing Highway Projects and complete them expeditiously. Apart from this, regular review meetings are held with project developers, State Governments and contractors in Head Quarter as well as in field offices with the implementing agencies. 

 

This information was given by Minister of State for Road Transport & Highways, Shri Pon. Radhakrishnan in a written reply to a question in the Rajya Sabha today. 

 

*****